Kitchen Remodeling

The most important room to remodel is your kitchen. More and more, the kitchen is becoming the focus for gatherings of friends and family. If you are only planning to remodel your kitchen, you can jump ahead to our “Kitchens” page for a complete description of that renovation process.

Planning is absolutely essential in remodeling a kitchen

1)  The homeowner should first identify the main objectives of their future kitchen. They should next research the latest products on the market including: cabinets, countertops, appliances, and flooring. If the kitchen is more than 5 years old, there are a lot of new products to choose from. For example, Silestone is quickly surpassing Granite and Corian, as the premier countertop surface as it is extremely hard, elegant in appearance, and comes in many colors

2)  For cabinets, the trend appears to be towards lighter colors as they help the appearance of lightening and enlarging a room. In regards to appliances, the Stainless Steel look appears to be in. And for flooring, vinyl or wood is the trend. Tile looks nice, however, it can be unforgiving in a room where things tend to get dropped. In addition, if there is no radiant heating planned for the floor, tile has the tendency to feel cold on the feet.

Cabinets: Out with the Old and In with the New

Once the cabinets arrive, the cabinet installers will remove the existing cabinets and countertops, unless the homeowners decide to do this themselves, and install the new cabinets. If new flooring is planned, I would suggest installing the flooring between removing the old cabinets and installing the new ones, as this will save time and money. In addition, particularly with Linoleum, you will get a better end product, as the Linoleum will be unable to lift-up over time, if the material goes under the cabinets. If new flooring does get installed prior to the cabinet and countertop installation, additional care will be needed to ensure the floors are not damage during this process.

Installing the Countertops

After the new cabinets have been installed, measuring and templating for the new countertops will be required if Silestone, Granite or Corian are to be used. This task should be planned in advance so that it can be performed the same day the cabinets are installed. This will help to reduce the disruption time. Once the templating has been completed, expect several days to a week for the countertops to actually be cut and installed. During this interval the Kitchen Design Center should install a temporary countertop and faucet so that your kitchen remains operational.

Though remodeling a kitchen can be a huge disruption to the homeowner, the finished product will quickly erase the brief inconvenience. Between its new and contemporary look and features, and the knowledge of making a sound investment, the homeowner will swiftly forget about the disruption as they fully enjoy their new kitchen.

Posted on December 19, 2010 at 12:10 pm

No comments

Categories: General-Contractor

Recieve new post updates: Entries (RSS)
Recieve follow up comments updates: RSS 2.0

No comments yet. You should be kind and add one!

Leave your comments

By submitting a comment you grant MMI Construction a perpetual license to reproduce your words and name/web site in attribution. Inappropriate and irrelevant comments will be removed at an admin’s discretion. Your email is used for verification purposes only, it will never be shared.